Insight4 min read

Mangrove 12-Month Interim: Survival, Waves and the Next 50 km Decision

12 months, transects read: survival vs. target, gauges vs. model — interim science on 10 km protecting 3,000 homes.

Research Interim · Coastal Resilience · November 2026

Twelve months after planting, the transects speak. Survival is tracking near the 75% target (by zone), wave gauges show attenuation within modeled bands, and the 3,000-home envelope holds — interim science on 10 km of mangroves from the $1.5M pilot. The next-50-km decision waits for month 24, as promised.

Key takeaways — 12-month interim

  • 10 km read; survival near 75% target (zone-weighted); gauges in-band.
  • Envelope: ~3,000 homes (conservative, tide-adjusted).
  • Maintenance: community crews + municipal agreement; culverts/gauges serviced weekly.
  • Protocol: WRI-aligned; full transects via data room.

1. Transects: survival by zone, not average

Averages lie; zones tell truth. Low-intertidal pioneers beat target, mid-zone on target, high-zone margins tight where freshwater flushing lagged — culverts since cleared. Nursery hardening (not planting speed) predicted survival, confirming the mid-year correction. Fishery nursery use appearing on schedule; youth stipends linked to Summit pipeline.

2. Gauges: attenuation, not anecdote

Seaward/landward gauges show wave-energy reduction within modeled bands for the events sampled — modest seas, not yet a major storm. That honesty matters: 12-month data proves establishment, not storm-proofing. The 24-month storm test remains the gate, per protocol. Households counted GIS-conservative behind restored reaches, municipal rolls sampled third-party.

“A mangrove that survives 24 months is infrastructure. One that does not was landscaping. Month 12 says establishment; month 24 decides scale.” — Foundation, Resilience Lead

3. Exhibit: 12-month interim dashboard

Figure 1. Interim vs. target.
IndicatorInterim / target
Length read (km)10
Survival vs. 75% target (index)98
Gauge events in-band (%)83
Homes in envelope3000

Mixed units for shape; see text. Table canonical.

Mangroves read10 km
Survival vs target~98%
Homes3k
Grant$1.5M

4. Grey-green upkeep: bunds, culverts, gauges

Low bunds broke chop during establishment; culverts restored tidal flushing under access tracks; gauges proved rather than asserted. Community crews clear culverts and read gauges on the same weekly rhythm as tower/feeder patrols (see Active Governance). Green without grey washes away; grey without green impoverishes. The pilot pairs both — and measures both.

5. The 50-km rule: 24 months, storm, co-funding

Scale needs three greens: 24-month survival at/above target, storm-event attenuation within bands, and municipal co-funding secured. Methods and transects shared with WRI peers and DFI co-funders via data room. If thresholds miss, we publish why — the misses-in-ink standard. Resilience is a survival curve, and ours stays public at 12 and 24 months.

Coasts that protect revenue, not just homes

Site selection favored coasts where tower crews and feeder patrols need access — resilience that protects revenue as well as roofs. Crews share tracks, spares and safety protocols; liaison is one team, not three. The 3,000-home envelope therefore shields customers and infrastructure together, the green-gray complement to Meridian mesh logic. Climate adaptation that does not keep lights and signal on is incomplete; ours is designed to do both, measured at 12 and 24 months.

Grey details decide: low bunds breaking chop during establishment, culverts restoring tidal flushing under access tracks, gauges proving attenuation rather than asserting it. Community crews clear culverts and read gauges weekly — the same rhythm as tower/feeder patrols. Green without grey washes away; grey without green hardens a shoreline while impoverishing it. The pilot pairs both, and the 50-km call waits for storm proof, not sentiment.

Sharing science: WRI peers and DFI co-funders

Transect protocol, gauge series and household methods shared via data room; WRI-aligned briefs for peers; counterfactual memos for DFIs (would this belt have closed without the grant, when, at what price?). If 24-month + storm + co-funding all green, the next 50 km follows with municipal match. If any red, we publish why — the misses-in-ink standard that makes a $1.5M grant science rather than sponsorship.

Gate logic: 24 months, storm, match

Scale needs three greens: 24-month survival at/above target, storm-event attenuation in-band, municipal co-funding secured. Methods shared with WRI peers and DFIs; transects pre-registered, sampled third-party. If any red, publish why — science, not sponsorship. Month 12 says establishment; month 24 plus storm decides the next 50 km.

Zones, not averages

Low-intertidal beat target, mid on target, high margins tight where flushing lagged — culverts since cleared. Nursery hardening predicted survival better than planting speed. Averages lie; zones tell truth. Month 12 establishment; month 24 plus storm decides 50 km.

Grey-green upkeep continues weekly: bunds checked, culverts cleared, gauges read — community crews with municipal backing, same rhythm as tower and feeder patrols. Establishment at 12 months; storm proof plus co-funding decides 50 km at 24 months, published either way.

FAQ

Full transects?

Species/zone tables via Contact; protocol pre-registered, third-party sampled.

Storm test yet?

Modest events only; major-storm performance pending — the 24-month gate.

Co-benefits?

Fishery, access for tower crews, youth jobs — logged quarterly.

Sources: Pilot transect + gauge logs, 12-mo interim (management). External links for context only.

Research Interim Published by Tilly Boddington, Director of Digital Transformation, Neyius Corporation · In conversation with Harper Moore, J.D., M.B.A., Managing Director and Head of Asia-Pacific · Reviewed by Neyius Advisors, external counsel & communications · Disclosures: Interim; 24-month + storm performance pending; not investment advice. · Contact · © Neyius Group. Dated Nov 13, 2026.